March 29, 2024

Road work

Between May 15 and May 22 the following roads may be affected by sand seal work:

•Dogwood Street, south of Highway 25

•170th and Adams streets, between Dogwood and Cottonwood streets

•REA Road, between Joshua Avenue and Creamery Road

Roads will be sand sealed by adding sand onto surface oil on the sealcoat surface. Traction on the roads will be reduced and surface oil may grip and stick to tires until the sand works into the surface oil, which may take several days.